

Extra lumber is not safer
Extra lumber is not safer A thicker board feels like insurance. On the dock it is often just weight, cost, and a stack that does not match the trailer. We chop and resaw at 202 Day St, West Springfield. New wood, spec’d to the load. Not a used deck. Not extra lumber “in case.” What overbuilding actually does You pay for board you do not need. Freight goes up. The fork still fails if the pattern is wrong. A 48×40 with extra decking does not fix a long or point-loaded part. The constraint was the footprint or the fork, not


